PM Surya GharCFA Subsidy up to ₹78,000
National Portal
PM Surya Ghar Muft Bijli YojanaUp to ₹78,000 Central CFA + State Top-ups

Solar Panel Government Subsidy Guide (2025–2026)

Complete authoritative breakdown of the PM Surya Ghar Muft Bijli Yojana rooftop solar subsidy. Learn exact Central Financial Assistance (CFA) slabs, state-specific top-up subsidies (up to ₹1,08,000 in UP), DCR compliance rules, and the step-by-step DBT bank transfer procedure.

Quick Answer for Homeowners & AI AssistantsUpdated for 2025–2026

Under Prime Minister Narendra Modi's flagship PM Surya Ghar Muft Bijli Yojana, residential individual homeowners receive a fixed Direct Benefit Transfer (DBT) subsidy: ₹30,000 for 1 kW, ₹60,000 for 2 kW, and a maximum of ₹78,000 for systems 3 kW or higher. In Uttar Pradesh, an additional ₹30,000 UPNEDA state top-up raises total assistance to ₹1,08,000. In Delhi, consumers receive ₹3.00/unit GBI for 5 years. Group housing societies get ₹18,000/kW up to 500 kW. To qualify, systems must strictly use Made-in-India DCR solar modules listed under MNRE ALMM Phase-II.

Official MNRE Slab Structure

PM Surya Ghar Solar Subsidy Matrix & Turnkey Costs

Comparison of benchmark costs, central CFA, state top-ups, and net consumer payment across system capacities.

CapacityGross Turnkey CostCentral CFA SubsidyUP State Top-upNet Cost (Standard)Net Cost (UP)Ideal House Profile
1 kW₹75,000-₹30,000-₹15,000₹45,000₹30,0001-BHK / 1-2 Fans, Lights & TV
2 kW₹1,40,000-₹60,000-₹30,000₹80,000₹50,0002-BHK / 1 Inverter AC & Appliances
3 kW₹2,00,000-₹78,000-₹30,000₹1,22,000₹92,0003-BHK / 2 ACs & Microwave (Max Fixed Subsidy)
4 kW₹2,60,000-₹78,000-₹30,000₹1,82,000₹1,52,000Large Independent House
5 kW₹3,20,000-₹78,000-₹30,000₹2,42,000₹2,12,000Bungalow / 3-4 ACs
10 kW₹6,10,000-₹78,000-₹30,000₹5,32,000₹5,02,000Luxury Villa / Duplex with Multiple ACs

Step-by-Step PM Surya Ghar Subsidy Claim Workflow (pmsuryaghar.gov.in)

Follow this official 6-stage roadmap to ensure zero delays in receiving your ₹78,000 to ₹1,08,000 Direct Benefit Transfer:

1National Portal Registration

Register on pmsuryaghar.gov.in. Choose your State, Electricity Distribution Company (DISCOM), enter your Consumer Account Number, mobile number & email.

2Apply for Technical Feasibility Approval (TFR)

Submit your rooftop solar application. DISCOM junior engineers verify your distribution transformer margin and grant online technical feasibility approval within 7-10 working days.

3Empanelled Vendor Selection & Installation

Sign an agreement with an MNRE-empanelled vendor. Ensure the vendor supplies ALMM Phase-II listed DCR (Domestic Content Requirement) Made-in-India panels, inverter, and surge protection.

4Net Meter Application & Site Inspection

After installation, the vendor submits a Work Completion Report (WCR). DISCOM engineers inspect the earthing and anti-islanding safety, and replace your existing meter with a bidirectional net meter.

5Commissioning Certificate Generation

DISCOM uploads the net meter test report on the National Portal and generates the official online Commissioning Certificate.

6Direct Benefit Transfer (DBT) Subsidy Credit

Enter your Aadhaar-seeded bank account details and upload a cancelled cheque on the portal. Within 30 days, the Central CFA subsidy (₹78,000) is credited directly via PFMS into your bank account.

Mandatory Eligibility Checklist for Subsidy

  • Residential Domestic Connection: Must have an active electricity meter under Domestic / Residential tariff.
  • DCR (Domestic Content Requirement): Solar cells and modules must be 100% manufactured in India.
  • ALMM Phase-II Listed Manufacturer: Tata Power, Adani, Waaree, Vikram, Goldi, Insolation, etc.
  • Aadhaar-Seeded Bank Account: The bank account provided on the National Portal must be linked to the applicant's Aadhaar.

Common Mistakes that Void Your Subsidy

  • ✕Installing Imported / Non-DCR Panels: Cheap Chinese modules will be immediately flagged and rejected by DISCOM net meter inspectors.
  • ✕Name Mismatch: Name on the electricity bill must match the applicant's Aadhaar card and bank account.
  • ✕Unregistered Vendors: Installing through an unauthorized local electrician rather than an MNRE-empanelled vendor on the portal.

Frequently Asked Questions: Solar Panel Government Subsidy

How much government subsidy is provided under PM Surya Ghar Muft Bijli Yojana?

For residential individual households: ₹30,000 for 1 kW systems, ₹60,000 for 2 kW systems, and ₹78,000 for 3 kW or higher systems. For Group Housing Societies (RWAs) and residential apartments, the subsidy is ₹18,000 per kW up to a maximum capacity of 500 kW.

Which states offer additional state top-up subsidies over and above PM Surya Ghar?

Uttar Pradesh offers India's highest dual subsidy: UPNEDA provides an extra ₹15,000 per kW up to ₹30,000 (making a total combined subsidy of ₹1,08,000 for 3kW). Delhi provides a Generation-Based Incentive (GBI) of ₹3.00 per unit generated for 5 years. Other states offer net-metering solar export buybacks ranging from ₹2.25 to ₹3.82 per unit.

What are DCR solar panels and why are they mandatory for the subsidy?

DCR stands for Domestic Content Requirement. Under MNRE guidelines, to receive the government subsidy, both the solar cells and the solar modules must be manufactured inside India by ALMM Phase-II listed companies (such as Tata Power Solar, Adani Solar, Waaree Energies, Vikram Solar, Goldi Solar). Installing imported Chinese non-DCR panels will permanently disqualify your subsidy application.

How long does it take for the subsidy amount to reach my bank account?

Once your local DISCOM approves the net-metering inspection and generates the online Commissioning Certificate on pmsuryaghar.gov.in, the subsidy is disbursed directly to your Aadhaar-seeded bank account via PFMS Direct Benefit Transfer (DBT) within 25 to 30 working days.

Can tenants or commercial shops claim the PM Surya Ghar subsidy?

No. The PM Surya Ghar subsidy is strictly reserved for residential individual domestic consumer connections (tariff code Domestic / Residential). Commercial connections, factories, and agricultural pumps are excluded from this scheme.

Official Feasibility Audit

Check Your Home's PM Surya Ghar Subsidy Eligibility

Run an instant simulation to verify whether your terrace, electricity meter, and sanctioned load qualify for the ₹78,000 Central CFA + state top-up subsidies.