Solar Panels in Rajasthan: Price with Subsidy (2025–2026)
Complete guide to installing rooftop solar panels across Rajasthan. Calculate exact turnkey costs from 1 kW to 10 kW, PM Surya Ghar Central CFA subsidies (up to ₹78,000), DISCOM net-metering approvals, and SBI 7.00% concessional green solar loans.
Rajasthan leads all Indian states in solar irradiation with 5.6 peak sun hours per day, yielding ~1,650 units per kW annually. A 3kW system costs ~₹1,96,000 gross; after the ₹78,000 PM Surya Ghar Central subsidy, net consumer cost is ~₹1,18,000. Generating ~415 units/month, Rajasthan homeowners save over ₹3,150 monthly with a rapid 3.1-year payback period.
Rooftop Solar Panel Price in Rajasthan (1 kW to 10 kW)
Turnkey system costs including DCR ALMM Phase-II panels, grid-tie inverter, HDG GI mounting structure, ACDB/DCDB, surge protection, bi-directional net meter, and commissioning.
| Capacity | Roof Area | Gross Cost | Central Subsidy | Net Price | Monthly Generation | Monthly Savings | SBI 7% Loan EMI | Payback |
|---|---|---|---|---|---|---|---|---|
| 1 kW | 100 sq ft | ₹75,000 | -₹30,000 | ₹45,000 | ~138 units | ~₹900 | ~₹680/mo | 4.1 Yrs |
| 2 kW | 180 sq ft | ₹1,39,000 | -₹60,000 | ₹79,000 | ~275 units | ~₹1,900 | ~₹1,193/mo | 3.5 Yrs |
| 3 kW | 280 sq ft | ₹1,96,000 | -₹78,000 | ₹1,18,000 | ~415 units | ~₹3,150 | ~₹1,782/mo | 3.1 Yrs |
| 5 kW | 450 sq ft | ₹3,15,000 | -₹78,000 | ₹2,37,000 | ~690 units | ~₹5,400 | ~₹3,578/mo | 3.6 Yrs |
| 10 kW | 900 sq ft | ₹6,00,000 | -₹78,000 | ₹5,22,000 | ~1375 units | ~₹11,200 | ~₹7,881/mo | 3.8 Yrs |
Electricity Boards & DISCOM Net Metering in Rajasthan
Official distribution utilities connected with the PM Surya Ghar National PortalRajasthan receives the highest solar irradiation in India (5.6 sun hours/day), producing up to 1,650 units/kW/year. This maximum generation yields tremendous bill savings with JVVNL, AVVNL, and JdVVNL.
Step-by-Step Net Metering & Subsidy Claim Workflow in Rajasthan
Submit your DISCOM K-Number (JVVNL/AVVNL/JdVVNL) on pmsuryaghar.gov.in.
Assistant Engineer (AEN) inspects distribution line margin and grants NOC.
Vendor sets up DCR panels, high-grade structure, and grid inverter.
Bi-directional net meter installed and calibrated by DISCOM engineers.
Direct credit of ₹78,000 into consumer's bank account via DBT.
Solar Rooftop Bank Loans Available in Rajasthan
Under the PM Surya Ghar scheme, leading public sector banks provide collateral-free green solar loans across Rajasthan at a concessional interest rate of 7.00% p.a. via the JanSamarth Portal:
Solar Panel Prices & Verified Installers Across Major Cities in Rajasthan
Select your city for city-specific electricity tariff slabs, DISCOM feeder feasibility, and local installation costs:
ALMM Phase-II Listed Domestic Hardware Available in Rajasthan
All systems eligible for the PM Surya Ghar subsidy in Rajasthan strictly mandate Domestic Content Requirement (DCR) cells and modules manufactured by MNRE ALMM Phase-II listed producers:
Frequently Asked Questions: Solar Panels in Rajasthan
Why do solar panels generate the most electricity in Rajasthan?
Rajasthan has over 325 clear sunny days annually and the highest solar insolation in India (5.6 peak hours/day), producing up to 1,650 units/kW per year.
What is the net price of 3kW solar in Rajasthan?
Around ₹1,18,000 net after deducting the ₹78,000 PM Surya Ghar Central subsidy from the ₹1,96,000 gross benchmark.
What is the net metering buyback rate in Rajasthan?
Under RERC regulations, surplus solar exported to the grid is settled at approx ₹3.14 per unit annually.
Explore Solar Panels in Other States of India
View All 28 States & UTsCompare PM Surya Ghar subsidies, state top-ups, DISCOM net metering regulations, and solar insolation across India:
Ready to Cut Your Electricity Bill by up to 90% in Rajasthan?
Upload your electricity bill or enter your monthly consumption to get your personalized 25-year financial ROI audit, exact subsidy calculation, and verified DISCOM installer bids.